Petroleum Terminal Handling and Diesel Exhaust Fluid

PHONE: (800) 547-9393 • (513) 696-1500 • Fax: (800) 245-8536 • (513) 932-9845 Printed in USA 8/07 2726 Henkle Drive • Lebanon, OH 45036 • www.opw-es.com © Copyright 2007, OPW Engineered Systems D E S I G N C R I T E R I A 43 Will Additional Equipment be Added by Others? ( Specify Weight & Location) ❏ Electrical Tracing lbs/ft ❏ Insulation lbs/ft ❏ Hose ❏ Valve/Fitting ❏ Other Other Desired Features: Dimensional Data: Top Loading/Unloading A CL of Riser to CL of Tank Opening: Max. Min. A 1 Number of Openings B Ground Level of Top of Tank C Ground Level to Top of Platform D Ground Level to Riser Riser Configuration: ❏ 1 ❏ 2 ❏ 3 RISERS ISLAND MIN MAX E Ground Level to Overhead Obstruction H Top of Tank to Top of Safety Rail L 1 Number of Risers L 2 Distance Between Risers Distance Between Openings Bottom Loading/Unloading I Ground Level to CL Tank Connection J Ground Level to Top of Riser K CL of Riser to Tank Fitting: Max. Min. L 1 Number of Risers L 2 Distance Between Risers What Current Metals and Sealing Materials are being used in this application (Pump, Valves and Meters)? Metals Seals TOP VIEW

RkJQdWJsaXNoZXIy NDE1MjE4